Process

How we work

The hardest question about an offshore team is not whether they can do the work. It is whether you will be able to see it happening, whether your IP is safe, and whether anyone will answer when you ask.

Six stages, six deliverables

Each stage names what you receive at the end of it. A stage without a deliverable is a promise, not a process.

  1. Discovery

    Requirements review, feasibility, risk list

    Deliverable

    Technical proposal and fixed quote

  2. Architecture

    Block diagram, part selection, stack-up plan

    Deliverable

    Architecture document, BOM v0

  3. Design

    Schematic, layout, firmware, RTL

    Deliverable

    Schematic review package, weekly build

  4. Simulation and review

    SI/PI simulation, DFM check, design review call

    Deliverable

    Simulation report, DRC/DFM report

  5. Prototype and bring-up

    Fabrication, assembly, board bring-up, debug

    Deliverable

    Working prototype and test report

  6. Production transfer

    DFT, test jig, pilot run, supplier qualification

    Deliverable

    Full design package — you own all files

An RF system under integration test, with the analyser and a laptop dashboard showing the run
Integration and system test, before anything leaves the building.

IP and confidentiality

The commitments below are contractual, not aspirational.

NNN agreement under PRC law

We execute a non-disclosure, non-use and non-circumvention agreement governed by PRC law and enforceable in the courts that would actually hear the case. A generic English-language NDA is weakly enforceable here, and we would rather tell you that than let you find out later.

You own 100% of the design IP

Schematics, layout source, Gerbers, firmware source, RTL, test procedures and the BOM with qualified alternates. Not a licence to use them — ownership. We keep no rights that would stop you taking the design to another supplier.

Per-project access segregation

Project files are accessible only to the engineers assigned to that project. Nobody browses another client’s repository because it happens to sit on the same server.

Subcontractors are bound before they see anything

Where a specialist is engaged — a fabricator, an assembly house, a test lab — they are bound by the same terms before any design file is shared, and named to you in advance.

What handover actually includes

Every project ends with the complete design package: schematic and layout source in their native tools, Gerbers and drill data, firmware and RTL source with a build that runs from a clean checkout, simulation and test reports, and a BOM with alternates for every single-source part.

Communication

What you can expect, and how quickly.

Project-lead languages

English, Japanese and Chinese

Your project lead speaks your language directly. Nothing is relayed through a translator who does not understand the design.

Response commitment

One business day

Any question reaching your project lead gets a substantive answer within one business day — not an acknowledgement, an answer.

Reporting rhythm

Weekly, written

A written report every week: what moved, what did not, what is blocked, and what we need from you. Plus a working build or layout snapshot where there is one.

Tooling

Yours, not ours

We work in your repository, your issue tracker and your review process where you have them. A dedicated team should feel like part of your team.

Time-zone overlap — we are UTC+8
RegionOffsetShared working day
Japan / KoreaUTC+97 hours of shared working day
Singapore / SE AsiaUTC+7 – +88 hours — effectively full
Europe (CET)UTC+12 hours, mornings for us
US West CoastUTC−8Scheduled calls; async by default
US East CoastUTC−5Scheduled calls; async by default

Quality

The checks that run whether or not anyone asks for them.

  • A board on a pedestal facing a log-periodic antenna in an EMC chamber, emissions scan alongside
    EMC pre-compliance, before the formal test house rather than after it.
  • A board inside an environmental chamber with the temperature profile plotted on the monitor beside it
    Environmental and stress testing across the specified range.
  • A board in a thermal chamber with a thermal camera trained on it and the temperature curve on screen
    Thermal behaviour measured, not estimated from a datasheet.
  • A calibration kit and network analyser with a written calibration log open on the bench
    Instruments calibrated and logged, so that a measurement means something.

Design review checklist

  • Schematic review against the requirements list, with every deviation recorded
  • Stack-up and impedance targets agreed before layout begins, not after
  • Placement and escape strategy reviewed before any long trace is routed
  • High-speed channels checked against the loss budget for the standard in question
  • Power tree and decoupling reviewed against the PDN impedance profile

DRC and DFM procedure

  • Design rule check clean against the fabricator’s published capability, not a generic ruleset
  • DFM review run with the fabricator before release, covering stack-up tolerance and drill depth
  • Assembly review with the assembly house on footprint, polarity and test access
  • Every waiver documented, with who granted it and why

Test records and retention

  • Bring-up findings recorded per peripheral, including the faults found and how they were fixed
  • Simulation reports retained with the design revision they belong to
  • Dynamometer, current-profile and link-training measurements kept as raw data, not summaries
  • Records retained for the life of the engagement and handed over with the design package
Your side of it

What we need from you

Four things, and the point at which each one stops being cheap to change.

  1. Before we quote

    What the product has to do

    Interfaces, throughput, power budget, enclosure and environment. A rough specification is fine and normal — what we cannot price is an idea with no constraints attached, because the constraints are the work.

  2. Before layout starts

    The parts you have already committed to

    Anything already chosen, sourced or second-sourced: processor, connectors, sensors, the fabricator. Late substitutions are the most expensive kind. A part swapped after routing can mean re-doing the stack-up.

  3. Within one business day, throughout

    A decision-maker who answers

    One named person who can make a call without convening a committee. We commit to a substantive answer in one business day and the same commitment in the other direction is what makes it hold.

  4. Before the first build

    How it will be tested and by whom

    Any compliance target, customer acceptance test or existing test rig the board has to satisfy. Designing for a test you learn about afterwards means designing twice.

A smaller first step

Still deciding whether to trust a board to us?

Start with a design review. We audit a schematic, layout or firmware you already have and deliver a findings report with a fix plan — a small paid engagement that tells you how we work before you commit a programme to us.